#22 N.W. Blvd.
Second Phase of Maple/Ash Project
Start: June 20, 2008
End: September, 2008
Route #22 N.W. Blvd. will be rerouted when the rebuilding of the Ash-Maple corridor moves from Ash to Maple. Outbound routing will be detoured while the inbound detour already in place will be changed from the current configuration.
Inbound, route #22 will resume regular routing by turning south from N.W. Blvd. on Ash to Boone but will detour by continuing south on Ash, left on Broadway, left on Walnut, right on Boone and continue on regular route.
Outbound, route #22 will detour by continuing north on Monroe, left on Montgomery, left on Walnut, right on N.W. Blvd. and resume regular route.
A temporary route, the 22/23 Fill Shuttle will serve the DSHS, the Native American Center and the West Central Community Center during the project. View details about the shuttle here.
#23 Maple/Ash
Second Phase of Maple/Ash Project
Start: June 20, 2008
End: September, 2008
Route #23 Maple/Ash will change detour routing when the rebuilding of the Ash-Maple corridor moves from Ash to Maple. Maple from N. W. Blvd. to Broadway will be closed during this second phase. Inbound trips will resume regular routing on Ash at this time.
From downtown, route #23 will follow its regular route until the bus reaches Broadway, where it will detour by continuing north on Monroe, turn left on Montgomery, right on Walnut, left on Jackson, right on Maple and continue on regular route.
A temporary route, the 22/23 Fill Shuttle will serve the DSHS, the Native American Center and the West Central Community Center during the project. View details about the shuttle here.
#30 Francis
Start: July 28, 2008
End: September, 2008
Route #30 Francis will be rerouted when the repaving of Driscoll Blvd. begins.
Outbound, route #30 will detour from Assembly St. by turning right on Sanson, right on Alameda Blvd, left on Wellesley, left on Greenwood Blvd., right on Rowan and resume regular route.
Inbound, route #30 will detour from Rowan by turning left on Greenwood Blvd, right on Wellesley, right on Alameda Blvd., left on Sanson, left on Assembly and resume regular route.
#33 Wellesley
Alert #1
Start: July 28, 2008
End: September, 2008
Route #33 Wellesley will be rerouted when the repaving of Driscoll Blvd. begins.
Traveling eastbound, route #33 will detour from T.J. Meenach Drive by turning left on N.W. Blvd., right on “G” St., right on Wellesley and resume regular route.
Traveling westbound, route #33 will detour by continuing west on Wellesley, turn left on “G” St., left on N.W. Blvd., right on T.J. Meenach Dr. and resume regular route.
Alert #2
Start: June 16, 2008
End: September, 2008
Route #33 Wellesley eastbound will detour as construction on a realignment of the Freya Way and Springfield intersections begins.
Traveling eastbound, route #33 will turn left from Freya Way at Trent, right on Fancher, right on Broadway, left on Havana and then resume the regular route.
Traveling westbound, route #33 will turn right from on Havana at Broadway, left on Fancher, left on Trent, right on Freya Way and then resume the regular route.
#90 Sprague
Route #90 Sprague will be rerouted starting on March 17, 2008, when construction will severely limit traffic on Appleway from Henry Rd. to Corbin. The detour will be in effect for the duration of the project.
From Barker at Alki, #90 Sprague will turn right on Alki, left on Corbin, right on Appleway/Sprague and resume regular route.
Temporary bus stops will be installed on Alki at Greenacres, on Alki at Long, on Corbin at Alki and on Corbin at Appleway/Sprague.
Eagle Pass Holders
Beginning Monday June 16, the EWU Eagle Pass will no longer be accepted in Spokane Transit fareboxes.
The EWU Eagle pass program is valid through Sunday, June 15, 2008. After Sunday, June 15, 2008, EWU Student, Faculty and Staff identification cards are not valid for a ride. Passengers will be required to pay a fare.
September Schedule Changes
Check the routes and schedules page to see the changes that will take effect Sunday, September 21, 2008.